TYPICAL PROJECTS                

JOB NAME CONSULTANCY new/ refurbish/ existing/ conversion DESCRIPTION SCOPE RECOMMEND -ATIONS ETC VALUE DATE CLIENT
19 Bathwick St Mary Primary School Consultancy Scheme design and specification new Mechanical services for new school.     £45,000 1984 Diocese of Bath & Wells, County of Avon
22 High Dependency Unit ACE design and supervision new Converted existing building and new building Mechanical and electrical services, including standby generation £80,000   Gloucester Health Authority
35 CPSA Headquarters Offices, Clapham Design and consultancy services new Multi-storey office building Design of electrical systems and lighting   £300,000 1985 Haden Young Ltd
37 St Stephens CEVA Junior School Design and consultancy services conversion Phased remodelling of existing 420 pupil school in conservation area. Survey, feasibility, energy criteria, design of electrical and mechanical installations Insulation standards, controls, zone temperature controls, low energy lighting, minimal water heating, water controls, overall heating controls, Designed energy rating 285 kWh/m2 (better than DES Target of 290 kWh/m2) £150,000 1990 Diocese of Bath & Wells, County of Avon
39 Mendip Hotel, Blagdon Survey and feasibility study existing hotel with emphasis on proposed change of use to conference centre Recommendations for environmental mechanical, and electrical services   £200,000 1985 Further Education Staff College
39 Conference Centre , Further Education Staff College, Blagdon Mechanical and electrical ACE Consultancy services and supervision conversion conversion of existing buildings to new seminar and conference facilities Including air conditioning and comprehensive lighting controls   £105,000 1986 Further Education Staff College
42 St Andrews School, Bath ACE Consultancy services for design and construction new New school. Also improvements in existing Church Hall. Energy saving proposals and Mechanical and electrical services design Insulation standards, zone and temperature controls, low energy electric lighting, minimal water heating, water controls, ventilation standards, natural lighting. Designed energy rating 299 kWh/m2 (better than DES Target of 310 kWh/m2) £120,000 1987 Diocese of Bath & Wells, County of Avon
45 Retail Development, Clapham   new comprehensive shopping development with covered Mall, underground car park, exterior Electrical and lighting design   £250,000 1986 Haden Young Ltd
46 British Rail Ticket Office, Clapham Electrical and lighting design new new ticket office forming part of general redevelopment scheme. Including temporary works     £53,000 1986 Haden Young Ltd/British Rail .Southern Region
56 Further Education Staff College, Blagdon   refurb Lighting of refurbished library and restaurant serving new Conference Centre for energy conservation.     £3,000 1986  
58 Indoor Market, Clapham   new Design of electrical services and lighting, including metered supplies to approximately 70 market tenants including fast food outlets.     £85,000 1986 In Shops
63 High Dependency Unit     Operation and Maintenance manual for Gloucester Health Authority electrical systems.1986   ú40 000 1986  
74 Elderly Persons Flats, Lincombe Road, Downend ACE duties. new Sheltered housing development comprising 35 units. Design and supervision of mechanical and electrical services Highly rated by client as one of their best energy consumptions £180,000 1987 Kingswood Borough Council
79 Watchet CEVA Junior School, Watchet Somerset Consultancy services for design and construction stage New 240 pupil primary school. With Nealon Tanner Partnership : Architects Mechanical & Electrical services Insulation standards, zone time and temperature controls, low energy electric lighting, minimal water heating, water controls, ventilation standards, natural lighting. Designed energy rating 229 kWh/m2 (better than DES Target of 297 kWh/m2) £165,000 1988 Diocese of Bath and Wells, Somerset County Council
80 Monteclefe School, Somerton ACE duties for M&E design and construction New Extension to existing school. energy analysis and heating proposals & design   1987 Department ofDiocese of Bath and Wells Education and Science Somerset County Council
86 Cash Hall   existing Relighting of existing City Council Cash Hall. The lighting design incorporated new uplighters along with existing cold cathode feature lighting; the installation work was carried out whilst intensive office working continued in the Hall     £50,000 1988 Bristol City Council
99 The Island Hotel, Tresco, Isles of Scilly Survey feasibility and consultancy existing for major extensions and improvements to existing hotel in unique location . Interior and exterior M & E environmental and facilities services for limited energy supplies.   £75,000 1988 Tresco Estates
100 Chilcompton VA Junior School Mechanical and electrical consultancy New Primary School. Recommendations and services for design and construction ACE duties Orientation, insulation standards, zone time and temperature controls, low energy electric lighting, minimal water heating, water controls, ventilation standards, ample natural lighting, anti-stratification fans. Designed energy rating 244 kWh/m2 (better than DES Target of 310 kWh/m2) £130,000 1989 Diocese of Bath & Wells .Somerset County
109 22 Hendford Yeovil M & E consultancy services new Prestige office development. Feasibility study for air conditioning and natural ventilation options in relation to return on prospective investment with architects Architecton.   £300,000 1989 PLN Holdings
113 Communal Laundry Multidiscipline architectural and engineering full design services new laundry building and conversion of existing laundry for community room. (buildings & M&E works)     £80,000 1989 Bristol City Housing Dept
121 Liberty House Bristol with Bruges Tozer Partnership : Architects M & E design refurb remodelling of 1960 Office development office block to current standards     £12,000 1989 Aspen Developments
123 Berkeley Square Hotel Bristol M & E Consultancy services conversion remodelling of hostel to 4 star hotel   Room heating control method - occupier sensing £70,000 1989 Clifton Hotel Group
126 Bay Tree Hotel Burford Design refurb unique hotel refurbishment of 17th Century building. 25 bed 5 star hotel and 20 high quality sheltered retirement homes Feasibility study, energy conservation recommendations and M & E services design and construction consultancy Room heating control method - occupier sensing (electric heating) £300,000 1989 Select Hotels
139 Accommodation Block   refurb remodelled bedroom block of 15 units Mechanical and Electrical services   £30,000 1989 Further Education Staff College
141 Knightstone Island, Weston super Mare Comprehensive feasibility report refurb Environmental services for theatre, dance hall, swimming pool and restaurant and site facilities to be completely redeveloped as a commercial venture Services include heating, cooling, leisure pool, electrical, lighting etc   c £200,000 1991  
145 Inn Lodge Surveys, feasibility and design Existing & new Conversion of public house to hotel including 32 bedroom block Mechanical and electrical services for conversion of1991   £30,000 1991 Surrey Free Inns
154 St John & St Francis CEVA School, Bridgwater Design and construction consultancy services - with Beech Tyldesley, Architects New building Classrooms, library with solar central core. Primary School Energy analysis for major school extension. Energy conservation proposals and design of mechanical and electrical installations Passive solar heating, natural lighting, zone time/ temperature/ compensation control of heating, insulation & infiltration standards £81,000 1990 Diocese of Bath & Wells, County of Avon
156 Chewton Mendip CEVA Primary School Design and construction consultancy - with Beech Tyldesley, Architects New building School block incorporating existing swimming pool Energy conservation proposals and design of mechanical and electrical installations Zone time/ temperature/ compensation control of heating, insulation & infiltration standards, de-stratification fans, emitter types £64,000 1990 Diocese of Bath & Wells & County of Avon
163 Sidcot School Sports Complex Design and construction consultancy services New building swimming pool, sports hall, and changing Design of mechanical and electrical services for associated facilities, with energy and water use assessments and recommendations.   £170,000 1991  
210 Cheddar Swimming Pool SCHEME DESIGN New building Swimming Pool & sports centre M & E services sketch design     1995 Sedgemoor District Council
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
h 1   S J KINSELLA              
h 1   KINSELLA CONSULTING ENGINEERS              
  1 TYPICAL PROJECTS                
  1 JOB NAME CONSULTANCY new/ refurbish/ existing/ conversion DESCRIPTION SCOPE RECOMMEND -ATIONS ETC VALUE DATE CLIENT
h 19 Bathwick St Mary Primary School Consultancy Scheme design and specification new Mechanical services for new school.     £45,000 1984 Diocese of Bath & Wells, County of Avon
h 22 High Dependency Unit ACE design and supervision new Converted existing building and new building Mechanical and electrical services, including standby generation £80,000   Gloucester Health Authority
h 35 CPSA Headquarters Offices, Clapham Design and consultancy services new Multi-storey office building Design of electrical systems and lighting   £300,000 1985 Haden Young Ltd
h 37 St Stephens CEVA Junior School Design and consultancy services conversion Phased remodelling of existing 420 pupil school in conservation area. Survey, feasibility, energy criteria, design of electrical and mechanical installations Insulation standards, controls, zone temperature controls, low energy lighting, minimal water heating, water controls, overall heating controls, Designed energy rating 285 kWh/m2 (better than DES Target of 290 kWh/m2) £150,000 1990 Diocese of Bath & Wells, County of Avon
h 39 Mendip Hotel, Blagdon Survey and feasibility study existing hotel with emphasis on proposed change of use to conference centre Recommendations for environmental mechanical, and electrical services   £200,000 1985 Further Education Staff College
h 39 Conference Centre , Further Education Staff College, Blagdon Mechanical and electrical ACE Consultancy services and supervision conversion conversion of existing buildings to new seminar and conference facilities Including air conditioning and comprehensive lighting controls   £105,000 1986 Further Education Staff College
h 42 St Andrews School, Bath ACE Consultancy services for design and construction new New school. Also improvements in existing Church Hall. Energy saving proposals and Mechanical and electrical services design Insulation standards, zone and temperature controls, low energy electric lighting, minimal water heating, water controls, ventilation standards, natural lighting. Designed energy rating 299 kWh/m2 (better than DES Target of 310 kWh/m2) £120,000 1987 Diocese of Bath & Wells, County of Avon
h 45 Retail Development, Clapham   new comprehensive shopping development with covered Mall, underground car park, exterior Electrical and lighting design   £250,000 1986 Haden Young Ltd
h 46 British Rail Ticket Office, Clapham Electrical and lighting design new new ticket office forming part of general redevelopment scheme. Including temporary works     £53,000 1986 Haden Young Ltd/British Rail .Southern Region
h 56 Further Education Staff College, Blagdon   refurb Lighting of refurbished library and restaurant serving new Conference Centre for energy conservation.     £3,000 1986  
h 58 Indoor Market, Clapham   new Design of electrical services and lighting, including metered supplies to approximately 70 market tenants including fast food outlets.     £85,000 1986 In Shops
h 63 High Dependency Unit     Operation and Maintenance manual for Gloucester Health Authority electrical systems.1986   ú40 000 1986  
h 74 Elderly Persons Flats, Lincombe Road, Downend ACE duties. new Sheltered housing development comprising 35 units. Design and supervision of mechanical and electrical services Highly rated by client as one of their best energy consumptions £180,000 1987 Kingswood Borough Council
h 79 Watchet CEVA Junior School, Watchet Somerset Consultancy services for design and construction stage New 240 pupil primary school. With Nealon Tanner Partnership : Architects Mechanical & Electrical services Insulation standards, zone time and temperature controls, low energy electric lighting, minimal water heating, water controls, ventilation standards, natural lighting. Designed energy rating 229 kWh/m2 (better than DES Target of 297 kWh/m2) £165,000 1988 Diocese of Bath and Wells, Somerset County Council
h 80 Monteclefe School, Somerton ACE duties for M&E design and construction New Extension to existing school. energy analysis and heating proposals & design   1987 Department ofDiocese of Bath and Wells Education and Science Somerset County Council
h 86 Cash Hall   existing Relighting of existing City Council Cash Hall. The lighting design incorporated new uplighters along with existing cold cathode feature lighting; the installation work was carried out whilst intensive office working continued in the Hall     £50,000 1988 Bristol City Council
h 99 The Island Hotel, Tresco, Isles of Scilly Survey feasibility and consultancy existing for major extensions and improvements to existing hotel in unique location . Interior and exterior M & E environmental and facilities services for limited energy supplies.   £75,000 1988 Tresco Estates
h 100 Chilcompton VA Junior School Mechanical and electrical consultancy New Primary School. Recommendations and services for design and construction ACE duties Orientation, insulation standards, zone time and temperature controls, low energy electric lighting, minimal water heating, water controls, ventilation standards, ample natural lighting, anti-stratification fans. Designed energy rating 244 kWh/m2 (better than DES Target of 310 kWh/m2) £130,000 1989 Diocese of Bath & Wells .Somerset County
h 109 22 Hendford Yeovil M & E consultancy services new Prestige office development. Feasibility study for air conditioning and natural ventilation options in relation to return on prospective investment with architects Architecton.   £300,000 1989 PLN Holdings
h 113 Communal Laundry Multidiscipline architectural and engineering full design services new laundry building and conversion of existing laundry for community room. (buildings & M&E works)     £80,000 1989 Bristol City Housing Dept
h 121 Liberty House Bristol with Bruges Tozer Partnership : Architects M & E design refurb remodelling of 1960 Office development office block to current standards     £12,000 1989 Aspen Developments
h 123 Berkeley Square Hotel Bristol M & E Consultancy services conversion remodelling of hostel to 4 star hotel   Room heating control method - occupier sensing £70,000 1989 Clifton Hotel Group
h 126 Bay Tree Hotel Burford Design refurb unique hotel refurbishment of 17th Century building. 25 bed 5 star hotel and 20 high quality sheltered retirement homes Feasibility study, energy conservation recommendations and M & E services design and construction consultancy Room heating control method - occupier sensing (electric heating) £300,000 1989 Select Hotels
h 139 Accommodation Block   refurb remodelled bedroom block of 15 units Mechanical and Electrical services   £30,000 1989 Further Education Staff College
  141 Knightstone Island, Weston super Mare Comprehensive feasibility report refurb Environmental services for theatre, dance hall, swimming pool and restaurant and site facilities to be completely redeveloped as a commercial venture Services include heating, cooling, leisure pool, electrical, lighting etc   c £200,000 1991  
h 145 Inn Lodge Surveys, feasibility and design Existing & new Conversion of public house to hotel including 32 bedroom block Mechanical and electrical services for conversion of1991   £30,000 1991 Surrey Free Inns
h 154 St John & St Francis CEVA School, Bridgwater Design and construction consultancy services - with Beech Tyldesley, Architects New building Classrooms, library with solar central core. Primary School Energy analysis for major school extension. Energy conservation proposals and design of mechanical and electrical installations Passive solar heating, natural lighting, zone time/ temperature/ compensation control of heating, insulation & infiltration standards £81,000 1990 Diocese of Bath & Wells, County of Avon
  156 Chewton Mendip CEVA Primary School Design and construction consultancy - with Beech Tyldesley, Architects New building School block incorporating existing swimming pool Energy conservation proposals and design of mechanical and electrical installations Zone time/ temperature/ compensation control of heating, insulation & infiltration standards, de-stratification fans, emitter types £64,000 1990 Diocese of Bath & Wells & County of Avon
  163 Sidcot School Sports Complex Design and construction consultancy services New building swimming pool, sports hall, and changing Design of mechanical and electrical services for associated facilities, with energy and water use assessments and recommendations.   £170,000 1991  
  210 Cheddar Swimming Pool SCHEME DESIGN New building Swimming Pool & sports centre M & E services sketch design     1995 Sedgemoor District Council